To be eligible for a new K-ELECTRIC new connection, you need to fill out an online application with your ID and supporting document(s) and print it off. To complete the application, you need to sign the form and send it to the K-electric office. Once verification has been completed, a new customer will be invoiced (The document will display the current price and new customers will need to make a payment before taking ownership).

K-ELECTRIC ’s officers then make sure the connection is installed where you want it. K-electric new connection status can be inquired from the officer who is responsible for installing connection in your premises. For a further check on K-ELECTRIC ‘s new connection status, Contact the concerned officer from K-ELECTRIC to provide you with the updated situations in your area.

K-Electric New Connection

Consumers can get their K-electric new connection form from the Website. This form will require certain documents to be uploaded to register for an online K-electric new connection. Below are mentioned the documents explicit for residential, commercial, and industrial areas with below or above 80KW connection type.

 K-ELECTRIC New Connection

Documents Required

For Residential K-Electric New Connection

Below 80 KW / Non-Scheme:Above 80 / Scheme:
Valid CNIC of the applicantValid CNIC of the applicant
Valid CNICs of two witnessesValid CNICs of two witnesses
Ownership Document (only for the leased area)Ownership Document (only for the leased area)
Nearest or existing last paid billNearest or existing last paid bill Aasaan
Aasaan Meter Undertaking on Rs.100 Stamp paper (duly attested by a notary public or oath commissioner)Meter Undertaking on Rs.100 Stamp paper (duly attested by a notary public or oath commissioner) SITE / Layout Plan Approved Building Plan along with Covering letter

For Commercial K-Electric New Connection

Below 80 KW / Non-Scheme:Above 80 / Scheme:
Valid CNIC of the applicantValid CNIC of the applicant
Valid CNICs of two witnessesValid CNICs of two witnesses
Ownership Document (only for the leased area)Ownership Document (only for the leased area)
Nearest or existing last paid billNearest or existing last paid bill Aasaan Meter Undertaking on Rs.100 Stamp paper (duly attested by a notary public or oath commissioner)
Aasaan Meter Undertaking on Rs.100 Stamp paper (duly attested by a notary public or oath commissioner)SITE/ Layout Plan Approved Building Plan along with Covering letter
NTN Certificate/ATL.NTN Certificate/ATL.

For Industrial K-Electric New Connection

Below 80 KW / Non-Scheme

Valid CNIC of the applicant Company
Authorization letter on company letterhead/employee card/visiting card for authorized/Nominated Person along with their valid CNIC Ownership Document (only for the leased area)
List of Machinery on Rs 100 stamp paper or Company letterhead
Valid Trade License/NOC from Ind Association
NTN Certificate/ATL
Industrial Undertaking
Valid CNICs of two witnesses
Nearest or existing last paid bill
Aasaan Meter Undertaking on Rs.100 Stamp paper (duly attested by a notary public or oath commissioner)

Above 40 / Scheme

Mandatory Documents

  • Valid CNIC of the applicant Company
  • Authorization letter on company letterhead/employee card/visiting card for authorized/Nominated Person along with their valid CNIC Ownership Document (only for the leased area) List of Machinery on Rs 100 stamp paper or Company letterhead
  • Valid Trade License/NOC from Ind Association

Non-Mandatory Documents

  • NTN Certificate/ATL
  • Industrial Undertaking
  • Valid CNICs of two witnesses
  • Nearest or existing last paid bill
  • Aasaan Meter Undertaking on Rs.100 Stamp paper (duly attested by a notary public or oath commissioner)

Documents Requirements For Test Form Submission

(Residential / Commercial / Industrial / Agriculture)

Mandatory Documents requirements

  • Paid estimate &SD invoices
  • Valid EIK license copy of Electrical Contractor
  • Work Commencement Report
  • Power contract undertaking on Rs. 100/Stamp paper

Additional Documents Requirements

  • Challan required (commercial case)
  • Fitness Certificate (Industrial Case)
  • Power Factor Improvement Plant undertaking on one hundred Rs/ stamp paper (Industrial cases)

After your application is accepted and you submit all required documents, you will be issued an ID. This too has been made easier, and the number of documents required has been reduced. This ID can also be used to track your K-electric new connection status.

Applications that are unfinished or unclear will be ignored, do not let that happen to you!

If any one of the applicant’s submitted documents were found to be fake, the application will be immediately canceled, and the local authorities/authorities will be contacted.

K-Electric New Meter Connection Fee

The K-ELECTRIC new connection fee is determined by K-ELECTRIC’s concerned office, and you need to contact the office to ask about it. K-electric new connection charges are estimated after the application has been submitted and processed by the office and it may differ by the type of connection been requested. All you must do is to pay your k electric new meter charges and submit your receipt. K-ELECTRIC will then verify the payment. Once this is done, you will be given new connection status so you can check it as soon as possible.

K-Electric New Meter Connection

K-Electric Helpline

You may submit a formal complaint to K-ELECTRIC by following these steps: Open your internet browser. In the search bar, type “K-ELECTRIC complaint form” and click on the option that appears (“Complain about telecommunication services”).

The K-ELECTRIC helpline number is a simple method for electricity consumers of Pakistan to register K-ELECTRIC complaints regarding their electric service concerns and check the status of the problem if work has been done. They can simply call on K-electric contact number +92-21- 3263 7133 or +92-21- 3870 9132.

For technical K-electric complaints TYPE COMP and SEND A MESSAGE TO 8119 (registered users). In case the consumer is a non-registered user Type COMP and then your A/C number after the space and send the message to 8119.

Conclusion

K-Electric’s new connection online can be done in some very easy steps. Consumers just need to visit the site and fetch the online application form. Then upload all the required documents mentioned in the form according to the connection types. The K-electric new connection fee is to be paid to proceed with the process of new meter installation. Afterward, K-electric new connection tracking can be done by contacting the concerned K-ELECTRIC officer. The concerned officer is responsible for your K-Electric new connection meter installation. If you have any confusion about K-Electric New Connection, please write in the comment section.